The Taylor III photovoltaic solar plant is located in Butler, Georgia. The project’s installed capacity is 180 MWp. The plant consists of 1,565,520 thin-film photovoltaic modules spread across 955 acres. The plant was completed in Q4 2016. Scope of works: Total construction management; Site supervision; Logistics; Survey; Post installation; Modular support structure installation; BOS electrical installation; Commissioning and testing.